





PLOT 9
MASTER PLAN
Plot 9 covers a total area of 79,766 sqm, with a potential construction area of up to 30,000 sqm, and is geared towards large-scale logistics, industrial, and technological operations. Located in Aveiras de Cima, in Azambuja's prime zone 1, it benefits from direct access to a new industrial road, Estrada das Galinhas, with immediate connection to National Road 366, reinforcing operational fluidity and the separation between industrial and urban traffic. Its proximity to the A1 motorway (approximately three minutes away) and Lisbon (approximately 50 km away) ensures efficient integration into the main national logistics corridors.
About
Designed for intensive logistics operations, Plot 9 stands out for its large warehouse, supported by a three-story administrative area and a ceiling height of up to 15 meters, allowing for high storage capacity and vertical efficiency. The lot has complete licensing and an approved project, integrating loading and unloading docks, technical areas, ample maneuvering areas for heavy vehicles, and parking prepared for electric vehicles. The project also incorporates energy efficiency and sustainability solutions, such as photovoltaic production, intelligent monitoring and resource management systems, ensuring high standards of operational performance and long-term durability.
3D RENDERS
PLOT 9
AVETEL PARK: the new Logistics and Industrial Hub of Greater Lisbon

